日韩精品国产一区在线久草-欧美在线电影一区二区-亚洲成人av片免费播放-一级特黄大片久久网-日本黄色视频久久-亚洲天堂男人在线-在线精品欧美日韩

NHI Headlines

FANGDA GROUP NHI A NEW CHAPTER IN THE FIELD OF TUNNELING

Published:2020-12-23

On the morning of November 9th 2020, the earth pressure balance TBM produced by NHI for China Railway 12th Bureau was inspected and accepted in the assembly workshop of the tunnel boring equipment branch workshop. Before that, the TBM produced by NHI for China Railway 4th Bureau has just completed the factory acceptance. This two equipment will serve Shenyang Metro Line 2 South Extension Project.

"TBM made in Shenyang Serves Shenyang"

Speaking of TBM of Shenyang Metro and NHI, we have to talk about Shenyang Station of Shenyang Metro Line 1. The “Zhenxing No. 1” TBM produced by NHI was the one responsible for running through this station. The single-track tunneling length from Yunfeng North Street Station to Shenyang Station is 1,400 meters, and 45 train tracks need to be traversed. The vibration and impact caused by trains are the biggest test for the tunneling of TBM. In order to allow sufficient time for excavation and construction, NHI completed the "Zhenxing No. 1" production in only three months. This is also the first time that NHI TBM has served the Shenyang subway project.

With continuous deepening of urban construction and continuous improvement of the people's requirements for transportation, Shenyang's subway construction has also entered a period of rapid development, and NHI TBM has also participated more and more in the construction of Shenyang subway. On November 23th 2009, "Shenyang No. 1" TBM served the interval between Century Square Station and Xiashengou Station on Shenyang Metro Line 2; In January 2015, NHI and Shenyang Shield Equipment Engineering Co., Ltd. signed a contract to build φ6.28 soil pressure balance shield machine, serving the Shenyang Metro Line 9 Shensu West Road Station to Shengli South Street Station; In April 25th 2016, the φ6.28 soil was manufactured by NHI for the Urban Rail Branch of China Railway Shanghai Engineering Bureau. The pressure-balanced TBM started again on the left line of the interval between University of Science and Technology Station and Zhangshabu Station on Shenyang Metro Line 10, and started its second journey. This is the TBM which completed Shenyang on January 7, 2016 the section from Renjieshuian Park to Puhe Avenue Station on the northern extension of Metro Line 2 set a record of 24 meters per day and 504 meters per month before it set out again.

From 2006 to 2020, NHI successively provided 24 TBMs of various specifications for the Shenyang Metro Project, contributing to the construction and development of urban subway.

Technology Upgrades to Stabilize the Market

Focusing on users and keeping a close eye on the laws of market development, NHI takes accelerating product technology upgrades and innovations as the key to NHI's victory in dealing with fierce market competition.

The two construction companies which are responsible for the construction of the southern extension of Shenyang Metro Line 2 selected the φ6.48 earth pressure balance TBM produced by NHI at the same time, but they have very different equipment performance requirements. After understanding the technical requirements in detail, NHI design team immediately established a project research team. According to user requirements, two important indicators of driving torque and propulsion speed of TBM are customized. The project team used the technical reserves of serialization and experience accumulated in actual engineering applications, after repeated calculations and measurements, finally found a solution.

In addition, the construction companies proposed that the efficiency of segment transportation during construction was low, and hoped to improve the transportation efficiency through improved measures. After repeated demonstrations by the project team, the original secondary crane transportation was changed to double-beam crane transportation, which not only reduced intermediate links and increased space utilization, but also greatly improved the efficiency of segment transportation and greatly reduced failures. Meanwhile, incidence rate was reduced by large and efficiency of excavation was improved.

Break Through Tradition and Seek Exploration

As we all know, our country is rich in coal resources, the coal resources are in the deep buried layer, and the geological conditions are complex. The tunneling operations of coal mines basically use traditional blasting or cantilever tunneling machines. This traditional coal tunnel construction method that has remained unchanged for decades is facing progress. The shortcomings such as slow speed, high cost, high potential safety hazards, poor working environment and poor roadway forming quality have been difficult to meet the needs of modern coal mine roadway construction.

In order to solve this worldwide construction problem, Fangda Group NHI has the courage to innovate. In 2014, it developed a domestically-made 4.53m diameter coal mine rock tunnel full-face Road header (another type of TMB used in mining) test machine, which was applied to the roadway construction of Huainan Mining Group Zhangji Mine. Successfully digging 2 kilometers underground in a buried depth of 500 meters, it created a coal mine rock roadway with a maximum daily footage of 30.7 meters, an average monthly footage of 404 meters, a maximum daily footage speed 10 times higher than traditional technology, and a monthly footage 4.5 times higher than traditional method. If this equipment was a transition machine, then on April 18, 2019, the first domestically developed and fully independent IP rights of 6.33 meters large diameter coal mine rock tunnel full-face road header, which was successfully rolled off the assembly line at NHI, is the first series of products for the field of coal mine roadway construction officially matured. This equipment is customized for Shandong Xinjulong Company. The purpose is to solve the complicated geological conditions of horizontal roadways in Xinjulong mining area which has large underground depth, large tunnel diameter, long construction distance, poor construction environment and slow construction speed, etc. The 4.53m diameter roadheader used in the Xinyuan Mine of Yangmei Group in December 2019 is an effective improved and upgraded equipment for solving the actual problems encountered in the design and construction of the first two equipment. The 4.53m diameter half coal and rock road header manufactured in March 2020 has achieved a major technological breakthrough in coal mine roadway road headers. The applicable stratum of the equipment has changed from a rock layer to a half coal and half rock layer. The applicability of the equipment in coal mines has achieved significant breakthrough.

From the construction of the municipal subway to the excavation of coal mine tunnels, NHI has always kept exploring the field of tunnel engineering. As Fangda Group continues to increase its support for NHI, the future NHI will invest more research energy in unmanned and intelligent areas and continue to innovate and develop in the field of tunnel engineering, in order to lead the development direction of the industry.


无码精品A∨在线观看中文 欧美激情视频在线观看一区二区三区 | 惩罚抽插校花嗯啊白浆 | 久久午夜一区二区 | 999国内精品永久免费视频 | 最近中文字幕2018免费版2019 | 男人女人爽好猛好痛视频 | 波多野结衣AV在线播放 | 我把护士日出水了视频90分钟 | 无码AV免费精品一区二区三区 | 欧美一级99在线观看国产 | 琪琪亚洲AV永久无码精品无码 | 最近中文字幕在线看免费完整版 | 国产精品亚欧美一区二区三区 | 国产欧美精品一区二区色综合 | 日韩毛片AV无码免费一区二区三区 | 国产精品九九免费视频 | 超级乱淫片午夜电影网99 | 综合激情丁香久久狠狠男同 | 亚洲AV秘 无码一区二区三区一 | 国产日韓无码一区二区三区久久区 | 国产精品色拉拉免费看 | 精品国产AV无码喷奶水麻豆 | 岳啊灬啊别停灬啊灬快点视频× | 91精品国产品国语在线不卡 | 国产精品欧美久久久久天天影视 | 国产一级aa无码大片在线视频 | 宝贝别忍着喷出来嗯啊哦漫画 | 又大又紧又粗C死你视频 | 美女赤裸裸一丝不遮的图片动图 | 少妇被又大又粗又爽毛片久久黑人 | 国产香蕉九九久久精品免费 | 中文字幕亚洲综合小综合 | 两口子交换真实刺激高潮 | 特黄特色欧美亚洲高清二区 | 成人永久免费国产乱码二区三区视频在线 | 好爽毛片一区二区三区色欲 | 91热久久免费频精品黑人99 | 亚洲精品白浆高清久久久久久 | 麻豆久久久9性大片 | 班长让我坐在那个地方教我作业 | 少妇被躁爽到高潮无码麻豆AV |